Page 75 - LIUNA Provincial ICI Collective Agreement

Basic HTML Version

including epoxies applied to walls, ceilings and foundations of buildings
and structures or other similar surfaces by means of any equipment,
mode or method. The cleaning, sandblasting, brushing, rubbing of all
concrete or masonry including chipping, bush hammering, grinding,
patching whether done by air, gas, electric machine, water pressure or
laser.
The work involved in the installation of all post-tensioning or
prestressing systems on building or other structures, soil drilling and
sampling of all types. All phases of on-site erection, finishing and
caulking of precast concrete products and similar products including
outsulation.
Grouting of precast concrete products.
Form removal: Once the reusable form panels have been released
by loosening of the hardware, the removing, cleaning, oiling application
or releasing agents and carrying to the next point of erection of all
materials and panels, including flying forms, as well as the stripping of
forms which are not to be reused and of forms on all flat arch work.
Cleaning and clearing of all debris including wire brushing of
windows, scraping of floors, removal of surplus material and cleaning of
all debris in building and construction areas. The clean up of all work
areas.
The erection, dismantling and moving of tubular metal
scaffolding subject to a Local Agreement, if any with other trades. The
dismantling of temporary weather protection. The placing and removal of
temporary snow and wire fencing and loose barricades.
Tenders tending masons, plasterers and carpenters. Tending
shall include but not be limited to the preparation of materials and the
handling and conveying of materials. Demolition work, debris handlers,
74
Collective Agreement - Provincial ICI