Subject to Article 2.06 - Work Claimed But Not Limited To:
Excavation and site clearing for all buildings and associated work
including the non-mechanical digging, backfilling and grading of
trenches and foundations and compacting. Digging, piling, cutting and
placing of lagging, sheeting, cribbing, bracing, anchor shoring, anchor
installation and propping of foundations including torch cutting, splicing
and the welding of all work, holes and caissons. Pulling, extracting or
salvage of piling, capping of piling. Installation of tie backs, which shall
include cutting, placing, fastening, grouting and stressing of strand or tie
back systems. All drilling, blasting, jackhammering and handling of all
power and associated work. Pumps 6" diameter and under for water
control. Concrete polishing (e.g. retro plate), aerated flooring (e.g.
cupolex), insulated concrete foam blocks system (e.g. formtech), modular
bracing (e.g. plumwall)
Installation of wire mesh, the installation and application of
fibres in concrete, installation of concrete including placing and
operation of nozzle hoses, hoppers, chutes, rigging for walls, foundations,
mixing, handling, conveying, pouring, pumping, vibrating, gunniting,
finishing, smoothing or otherwise applying and finishing concrete
ceilings or vertical surfaces whether done by hand or any other process.
The drying of plaster, concrete, mortar or other aggregate and the
handling of temporary heating equipment. The installation of dry
packing, caulking, grouting, chemical compounds including thycol and
other rubber compounds. The work in connection with setup, operation,
clean up and dismantling of diamond or carbide core drilling bits,
concrete core drilling bits, concrete core drilling machines, concrete saws
and boring of holes in concrete.
The aging and curing of concrete, mortar and other materials