Page 168 - LIUNA Provincial ICI Collective Agreement

Basic HTML Version

167
waterproofer’s foremen’s rate of pay provided that he is acting in that
capacity that he continues to perform the same duties, seventy-five
percent (75%) of the time shall receive a minimum of one dollar and fifty
cents ($1.50) effective May 1, 2013 and one dollar and seventy five cents
($1.75) effective May 1, 2014 per hour above his current hourly rate. Once
that premium has been established with the employee he will continue to
receive that premium at all times.
ARTICLE 9 - CRAFT JURISDICTION
1.
Applying metallic waterproofing to walls, floors, footings, ceiling
and other surfaces as required.
2.
Metallic mortar, cement parging and concrete toppings for
protection of waterproofing floors, walls, pits, ceilings, trenches,
wood float and steel trowel finish.
3.
Metallic slurry coating of floors, walls, pits, trenches, etc.
4.
Metallic grouting.
5.
All preparation of surfaces for waterproofing.
6.
Asphalt and other bituminous coating hot or cold, including
reinforcing membranes and protective coverings or surfaces.
7.
Asphalt and other bituminous dampproofing and all vapour barriers.
8.
Caulking for the purpose of waterproofing and dampproofing.
9.
Pneumatically and mechanically installed waterproofing materials.
10.
Spandrel beam and column waterproofing, vapour barriers.
11.
Installation of all manufactured membrane for the purpose of
waterproofing and dampproofing.
12.
Parging for the purpose of waterproofing and dampproofing.
13.
Installation of reinforcing steel and wire mesh on concrete and
masonry restoration work.
Waterproofing Appendix