80
Trade Appendix - Masonry Tenders
scaffolding; all work in connection with the fabrication and installation of
weather protection including final fastening; and the construction and
dismantling of grout and castable formwork; the starting, stopping,
fuelling, oiling, cleaning, operating and maintenance of all mixers,
compressors, mortar pumps, concrete and grout pumps, fork lifts, man
and/or material lifts including, but not limited to scissor lifts, zoom boom,
telescopic or otherwise, platforms, tuggers and other devices under the
direction of the Employer or his representative and application of
waterproofing.
ARTICLE 3 - HOURS OF WORK AND OVERTIME
3.01 The normal hours of work shall be forty-two and one-half (42 1/2)
hours per week, Monday to Friday inclusive for all areas of this Agreement.
The standard working day for employees shall be not more than eight and
one-half (8 1/2) hours per day, between 7:30 a.m. and 5:00 p.m. The
starting time may vary up to one (1) hour by mutual agreement of the
parties operating under this Appendix.
3.02 Any work performed outside or in addition to the standard hours
outlined above shall be deemed overtime and overtime premium shall be
paid at the rate of one and one-half times (1 1/2x) for the first two (2)
hours in excess of the normal day and double time (2x) for all additional
hours worked. All work performed on Saturday, Sunday and holidays shall
be paid at double time (2x) the regular rate. This overtime provision shall
apply to shift work on masonry only. Refractory overtime shall be paid in
accordance with Sections 3.04 and 3.05.
3.03 The Employer shall have the right, after notice to the Union, to
vary the regular working hours as set out in 3.01 above, to provide for
eight (8) hours per day, Monday to Friday inclusive.